CONCRETE STRUCTURES

Installing pumping equipment into concrete structures can be a great and cost effective way to create a pump station, combining the groundworks and civils ability of your teams and our skilled teams.  For more details on the process of how this works click the link on point 4, installation process below.

1. INITIAL STEP

Send us the drainage layout and we'll advise different options available and who is responsible for what.

2. DESIGN AND DRAWING APPROVAL

Once an option has been selected, we'll complete the design package showing the requirements for your comments and approval.

3. BUILD

Build the manhole following dimensions from the drawing. If cast in parts are required ask for these early. If you are supplying parts get these checked against the drawing.

4. INSTALLATION

Tell us you're ready by completing a returning a site readiness form (DSR) and our team will turn up to the site and complete the first fix.

5. COMMISSIONING

Tell us when you are ready for final commissioning by returning a second site readiness form (PCF) and our teams will install the pumps and level controls and commission. 